Proven in the ground, and in the water.

A record of completed work for UK local authorities and commercial clients — solving problems other systems could not, in record time.

Vertical construction

Vertical construction: columns without shuttering.

Conventional vertical construction means shuttering, steel reinforcement, wet pouring, curing time and dismantling — days of work even in good weather. The Aquacast vertical method cuts that dramatically.

A vertical guiding support at the centre of each cast — a steel tube or cage that can double as reinforcement — anchors the build. Blocks assemble with their slots interlocking in opposing directions around the support, immediately forming a uniform, rigid column to the required height.

Construction can begin below water level and rise above it; blocks can be added or removed later, and concrete can fill the centre holes or gaps to form a permanent structure. Time and material savings of up to 50% are achievable in some cases.

Savings up to 50% Core steel tube / cage Below-water yes
Plan view of Aquacast vertical columns showing core support and shape options
Plan view — central support & shape options

Featured project

Cornfield Bridge, Diggle — a V-block retaining wall.

After previous unsuccessful attempts, Oldham Metropolitan Borough commissioned Aquacast to design and build the Cornfield bridge retaining wall using the V-block system.

Cornfield Bridge at Diggle — river-bank retaining wall built with the Aquacast V-block system
Cornfield Bridge, Diggle — V-block river-bank wall
  • Stopped active erosion threatening the structure
  • Supported the loading of the bridge above
  • Held the upper bank from sliding
Date October 2003 Duration 12 days System V-block

Completed without adverse impact to the natural environment; the Borough expressed complete satisfaction with the result.

International project

Morocco — built straight across the water.

At a marina development in Morocco, Aquacast blocks were piled and slotted together to build a sea wall and causeway directly across an open lagoon — working from the waterline up, with no need to drain the site first.

  • Bore-piled and slot-located across open water
  • Holds water back on one side while work continues on the other
  • Built up course by course to above the waterline
Location Morocco Type Marina sea wall & causeway System Interlocking blocks on piling
Workers building an Aquacast block causeway across a marina lagoon in Morocco
Causeway under construction — slotted blocks carried across the water
The Morocco lagoon before the Aquacast works began
Before — the open lagoon
Two workers laying Aquacast blocks along the wall over the water
During — laying blocks over the water
The finished Aquacast marina sea wall reflected in calm water
After — the finished marina wall

In flood

Baldwin Reservoir, Isle of Man — under flood load.

Field footage of an Aquacast block-built channel taking a full flood flow — floodwater running hard over the structure while the interlocking courses stay seated and in place. The truest test a retaining system gets.

Baldwin Reservoir — block-built channel during a flood event

Case studies

Completed-project records.

Eight completed projects — reservoirs, river works, sea walls, retaining walls and waterproof cofferdams — each with its full record available to download.

Also available: the Sienna Group sea-wall record, revision F2 (PDF), and a collection of client testimonials (PDF).

Structural engineering

Backed by calculation.

Work is supported by experienced geotechnical, structural, architectural and civil engineers. A set of structural calculations and method statements underpins the system, including:

  • Note de calcul — stabilité soutènement · 18-501-AQUC-EXE-NDC-001
  • Note d'hypothèses et méthodes de calcul · 18-501-AQUC-EXE-NHM-001
  • Avis technique — rétention d'eau · 18-502-AQUC-EXE-NT-001
  • Note vérification stabilité mur · 18-503-AQUC-EXE-NDC-002
  • Aquacast road-erosion annexe & method statement

The full calculation set and method statements are free to download from the technical library.

Download the structural set →